Features

General Takeoff Options
• SF Area or Dimensions
Conceptual or Detailed
*Model or Assembly Takeoffs
Mapped to eTakeoff

Takeoff Method Options
Man-Hour – for self performed work
Labor Only – when trades provide labor and you buy materials
Turn-Key – when trades provide labor and materials
Takeoff Method automatically determines level of detail

Material Takeoff Options
Specifications by type, size, gauge, finish, style, and species
Brand specific windows, plumbing, hardware, etc
Quality levels for tile, carpet, appliances, cabinets, counter tops

Format Options
1995 MasterFormat
2010 MasterFormat
UniFormat

Organization Options
Building
Unit
Floor
Room
Detail Descriptions from Plan Schedules

Management Options
Bid Packages
Scopes of Work for Trade Contracts
Vendor Material Lists for Purchase Orders
Schedule of Values for AIA Billing
Activities for Construction Schedule

Trade Material Markups
The database stores user’s material prices.  If materials are purchased by a trade, they can be adjusted to include the trade markup.

* Requires Sage Extended Estimating